<tbody id="3xxrp"><noscript id="3xxrp"></noscript></tbody><th id="3xxrp"></th>
  • <dd id="3xxrp"></dd>
    
    

    <nav id="3xxrp"></nav>
    <tbody id="3xxrp"></tbody>
    print this page email this page go to the top of the page
    Home
    Contact Us
    Sitemap
    Toyota Olaya Home, Olaya, Riyadh
    Messrs. Abdullatif Jameel Co.

    Construction of new Car Showroom and Workshop, including basement, ground floor Showroom and Workshop, first floor workshop and offices and second floor accommodation.

    Total area 16,086 sq.m.

    Completion Date: 31/3/2012
    Al-Jomaih Green Field Facility
    Al-Jomaih Automatic Company
    Construction of Al-Jomaih Car Showroom, Green Field Facility Building in Badiya, Riyadh, consisting of Basement, Ground Floor and 1st Floor (total 6715 sq.m.)
    Completion Date: 30/06/2011
    Al-Jomaih - Renovation of Showroom, Kurais Road, Riyadh
    Al-Jomaih Automatic Company

    Renovation of existing Car Showroom

    Total area 1865sq.m

    Completion Date: 31/08/2011
    Toyota Showroom, Jarokum, Kilo-7, Jeddah
    Messrs. Abdullatif Jameel Co.

    Renovationof Car Showroom and 1st floor offices - total area 910 sq.m.

    Completion Date: 31/03/11
    Al-Inma Bank, Al-Aziziah Branch, Riyadh
    Al-Inma Bank
    Construction of the Al-Aziziah Brnach for the Al-Inma Bank in Riyadh, comprising of Ground Floor and 1st Floor - total 1,300 sq.m.
    Completion Date: 28/02/2011
    Al-Inma Bank, Salman AL-Farsi Branch, Riyadh
    Al-Inma Bank

    Bank Premises in Salman Al-Farsi, Riyadh, comprisng of Groud Floor and First Floor (total 1,300 sq.m.)

    Completion Date: 28/02/2011
    Golden Chip Factory
    Golden Chip Company
    The Project consists of the construction of a Factory Building  in the Industrial Area of Dammam, comprising of Ground Floor (2,2770 sq.m.) and First Floor (275 sq.m.)
    Completion Date: 20/03/2011
    Abdullah Hashim Office Building (Honda)
    Messrs. Abdullah Hashim
    Construction of the Administration Building for HONDA dealers, comprising of Ground Floor (900 sq.m.) and First Floor (900 sq.m.)
    Completion Date: 31/03/2011
    El-Khereij Warehouse, Al Faisalya, Dammam
    El-Khereiji Construction Co. Ltd.
    Constructionof a new Warehouse Building - total area 13,710 sq.m.
    Completion Date: 30/06/2010
    © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio
    精品国产一区二区三区国产区,性爽交刺激视频免费看,av熟女乱一区二区三区四区,18禁止进入1000部高潮网站