<tbody id="3xxrp"><noscript id="3xxrp"></noscript></tbody><th id="3xxrp"></th>
  • <dd id="3xxrp"></dd>
    
    

    <nav id="3xxrp"></nav>
    <tbody id="3xxrp"></tbody>
    print this page email this page go to the top of the page
    Home
    Contact Us
    Sitemap
    Projects Executed
    ISIS Clinic
    Client:
    ISIS Medical Holdings Ltd. - Dr. Andreas Mavrides
    Architect:
    Minas Zanettos
    Duration: 9 months
    Commencement Date: January 2008
    Completion Date: October 2008
    Details
    The Project consisted of the complete renovation internally and externally of the ISIS Clinic in Ioannis Clerides Street, Nicosia.  The works included demolition of internal walls, doors, windows and ceilings and recreating the interior of the building, electrical and mechanical installations and the erection of a new dome on the ground floor.
    Back to Projects Executed
    © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio
    精品国产一区二区三区国产区,性爽交刺激视频免费看,av熟女乱一区二区三区四区,18禁止进入1000部高潮网站