<tbody id="3xxrp"><noscript id="3xxrp"></noscript></tbody><th id="3xxrp"></th>
  • <dd id="3xxrp"></dd>
    
    

    <nav id="3xxrp"></nav>
    <tbody id="3xxrp"></tbody>
    print this page email this page go to the top of the page
    Home
    Contact Us
    Sitemap
    Projects Executed
    Photo Gallery
    Water Development Department
    Client:
    Water Development Department
    Architect:
    Alecos Gavrielides
    Duration: 2 years
    Commencement Date: 2006
    Completion Date: 2008
    Details

    This was a Build-Operate-Own Project and was constructed in Joint Venture between GCC Ltd. and CHAPO.  The building consists of 6,500 m2 of office space, including electromechanical installations and external works.

    The Architect of the Project was Alecos Gavrielides and the Building was handed over to the Water Development Department at the end of June 2008.

    Back to Projects Executed
    © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio
    精品国产一区二区三区国产区,性爽交刺激视频免费看,av熟女乱一区二区三区四区,18禁止进入1000部高潮网站